Time: 2021-03-07 9:00 PM Beijing Time
Host: Kaifeng Xue
Agenda
Status Updates
Announce
Apache IoTDB 0.11.3 and 0.12.0 is still in progress
Improvement
# 2738 [IOTDB-1177] Trigger module: ANTLR, logical operators, physical plans and authorization
It is the entrance to the trigger management module, and should mainly contain the following parts of code:
- Trigger management SQL (ANTLR, logical operators, physical plans and corresponding execution interfaces)
- User authentication for trigger management
User Manual:
Chinese:
https://github.com/apache/iotdb/blob/0f48ba2de83d2b1c0da00bba8485baa1c60abe28/docs/zh/UserGuide/Operation%20Manual/Triggers.md
English: https://github.com/apache/iotdb/blob/0f48ba2de83d2b1c0da00bba8485baa1c60abe28/docs/UserGuide/Operation%20Manual/Triggers.md
#2732 [ISSUE-2493] show child nodes path
Image Modified
#2725 Optimize the executeBatch interface in JDBC
At present, the executeBatch method in JDBC is executed separately for each statement.
For the cluster version, each statement will be a raft log, which will lead to the cost of the raft log scrambling for locks and the RPC cost between the raft replication groups.
The insertRecords and insertTablets interfaces in session API also have the same problem, for details please see the following links.
The solution is similar to the previous one. The only difference is that the statements in the executeBatch interface may not only insert data, but also have metadata operations(like set storage group, create timeseries and so on). It is necessary to distinguish between metadata operations and data operations.
Now we let execute batch statment in JDBC really execute in batch at server.
#2714 [IOTDB-1024] Support multiple aggregated measurements for group by level statement
Currently, only one aggregated measurement is supported in this statement to avoid result ambiguity.
This PR is to support multiple aggregated measurements in group by level statement.
Future work:
1 performance improvement in distribute version
2 performance improvement in IoTDB in special user case
3 solve issues in Jira and github
Open Floor
new ideas, feedback, suggestions.
1. [Discussion] Monthly Contributor Award
Goal: Keep community more vibrant and attract new contributors
Attention: Not really an award, just a title that we can recognize with an announcement on the official wechat account
Preliminary measure:
- Amount of PR and reviews on GitHub (codes amount)
- Activity on mailing lists
- Contributions(publicity, tutorial, etc.) on social media (e.g. WeChat official account, CSDN, Stack Overflow)
- Being a conference host or event organizer will also count.
The final equation would be S=0.8Z(code)+0.1Z(doc)+0.1Z(mail)
- Call for mentors and plans
- Q & A docs(maintained in Github issue,shared by all groups)
- start up docs (mentor should provide some basic information doc such as code repository, design doc, experiment doc and official account)
- Wechat group
- Phase Feedback
- Sign up : 45 people
- To be as commiter : 17
- Users needing professional help : 5
- Both : 23
3.[Proposal] Hackthon (April)
issue:provide by people who interested in
https://github.com/apache/iotdb/issues/2715
provide a templet for consistency
num of member in a group:
<= 5
1 committer + 2-4 non-committer
aimed participants:student + contributor in community
reward:cash
1st price 30-50k RMB
T-shirt, backpack, bottle with IoTDB logo
agenda:
3.8-3.15 design of propaganda
The end of Mar: sign in
April: get familiar with each other and communicate with mentor
May: coding
10th Meeting Schedule
Time: 2021-03-21
Host: Yuyuan Kang