...
Version 1.3.1 is in preparation. The boss directly hires Zhu Hui from ppmc PPMC to be responsible for the release
Graduation progress incubator community discussion https://lists.apache.org/thread/vqxybqhjtvnokf9l74533rbk9dohto52
Single test task collection https://github.com/apache/incubator-linkis/issues/2985
ECP is responsible for managing the materials of EngineConn, as a management service, merged into LinkisManager https://github.com/apache/incubator-linkis/pull/3476
Configure Key to support hot loading method to obtain https://github.com/apache/incubator-linkis/pull/3841
Tenant IP address interception support https://github.com/apache/incubator-linkis/pull/3723
Tenant label automatic matching support https://github.com/apache/incubator-linkis/pull/3723
The data source supports mongodb MongoDB type https://github.com/apache/incubator-linkis/pull/3764
...
trino engine documentation
Engine Material Management Design Document Yang Yun SupplementDocument
seatunnel environment deployment support Li Meng
seatunnel user documentation Li Meng
Basic data management known problem fixes Zhiqiangfixes
Basic data management usage documents & API interface Zhiqianginterface
Data source enhancement Add self-test for oracle, kingbase, postgresqlPostgreSQL, sqlserver, db2, greenplum, dm data support (mainly several metadata query interface verification interface has been provided) Li Meng
Data source enhancement Add documentation for oracle, kingbase, postgresql, sqlserver, db2, greenplum, dm data support Li Meng
release-note preparation Ding Qi
Authorization verification of the release process Brother Ding Qi followed up Prepare the environment according to the release-guide
3. [Fixed topic] Apache Linkis 1.3.2 demand planning. —— Xi Shihao/Li Meng
1.3.2 Progress Xi ShihaoProgress
sparksubmit Spark submit once merged into existing spark plugin testing, bug fixes in progress
Spark has completed etl ETL through jsonJSON, (the data source is configured through the URL to be adapted to the JDBC data source)
udf UDF loaded according to id completed
Linkis thrift protocol implementation development progress 20% Li Meng
Engine parameter management, the first version has been developed, and further modification is needed. The interface development is completed, and the front-end joint debugging is to be completed. Unit testing Tao Zhiqiang/Qiao Mu
...