Here are the most common set of business requirement to support product level replenishment within a given facility(store/warehouse) via any inter-company facility (preferred warehouse/stocking facility) before raising the purchase order from an outside vendors/suppliers.

In current standard OFbiz workflow there are essentially two basic types of material requirements generated at product-facility level. Both of these can be created manually or could be suggested by MRP engine:

Gap
Currently the OFbiz planning algorithm (aka MRP) generate the requirement by only considering the supply available within the given facility. But there is no planning logic built into the system which can support and look up the supply availability in a complex supply chain setup where business could be run using multiple facilities spread geographically. A more common examples could be brick and mortar retail stores chain having multiple stores spread across geographically. Or any manufacturing business that own multiple production facilities and warehouse spread across geographically.

Requirement
There are many instances, where material visibility in a multi-facility setup within an organization or company is not very accurately gauged. We would need to start building an intelligent planning system that could gauge such material availability across facilities and honor them while furnishing the requirements around any product within any given facility. 
Let's consider following use case (Please refer to attached screenshot for reference)

 

 

Now we could design an OFbiz based replenishment planning that :